Real results on the
shop floor.
Five industrial scenarios where Patok transformed the operation. From metal contract manufacturers to SMEs starting from scratch.
Increase in average OEE
Logging time per part
Part-by-part traceability
Implementation time
Metal parts
contract manufacturer
A stamping and CNC plant with 12 machines running two shifts. No visibility into real OEE, downtime never recorded, and setup changes taking twice the standard without anyone knowing.




Automotive
assembly line
A Tier-2 supplier with 3 assembly lines and 45 stations. Material from 8 different suppliers arriving with no lot record, and quality problems showing up weeks after assembly.
Quality
lab
A QC lab with 6 test stations and 3 shifts. Paper records that got lost, test results disconnected from the parts they inspected, and ISO audits that ate weeks.




Multi-shift operation
with no supervision
An injection molding plant with 3 shifts and a single night supervisor. Problems from the second and third shift only surfaced the next day, downtime went unreported, and defective parts piled up with no alert.
From 0 to professional
in 2 weeks
An 8-person metalworking shop. Zero prior digitization. Everything on paper, no production control, no idea how long each part took. The owner wanted visibility without complicating his life.
Implementation timeline


Is your plant the next
success story?
Book a free diagnostic Gemba Walk. We visit your plant, identify improvement opportunities, and show you how Patok solves them.