PRODUCTION PLANNING

Plan against
real capacity.

Close the gap between the plan and what actually happens on the floor. Patok connects your demand to plant physics — not to historical averages or wishful thinking.

See Digital Twin
iMac screen showing MRP planning and materials management in Patok

Planning with theoretical data always fails

90% of plants promise dates based on what it "should" take, not on what it actually takes.

🎯

Dates based on wishes

You promise the date the customer wants to hear, not the one your plant can meet. The result: overtime, delays, and frustrated customers.

🔗

A plan disconnected from the floor

The plan lives in a spreadsheet or ERP nobody updates. By the time someone looks at it, the reality on the floor has changed completely.

📦

Material shortages

You find out material is missing when the operator is already at the machine. You stop the line, reschedule, and lose hours.

Patok connects demand to capacity

Work orders, materials, and real plant capacity — in one system that updates live.

Kanban board of production work orders on an ultrawide display showing flow in Patok
WORK ORDER MANAGEMENT

A sales Kanban connected to the floor

Every order becomes a visual flow that advances automatically with each operator scan. See what is being produced, what is waiting, and what has shipped — in real time.

  • Automatic percentage progress per finished part
  • Delay alerts with no manual intervention
  • Visual prioritization of urgent work orders
LIVE CAPACITY

See your real capacity, not the theoretical one

The Digital Twin shows you the real utilization of each machine, accumulated WIP, and active bottlenecks. Plan on today's data, not on data from a month ago.

  • Real vs. available utilization by workstation
  • Bottleneck Score to identify constraints
  • Factory Physics: Little’s Law and live queue pressure
Industrial monitor with a Digital Twin showing real plant capacity
Operator scanning a material pallet with a forklift for MRP
MRP & MATERIALS

Material Bay connected to the BOM

Every work order knows the materials it requires. The Material Bay knows what is available. Patok cross-checks both to calculate coverage and anticipate shortages.

  • A visual BOM with coverage levels
  • Smart lot matching by attributes
  • Shortage alerts before they stop the line

Traditional planning vs Patok

CriteriaTraditionalPatok
Planning basisHistorical averagesReal capacity, in real time
Work order visibilityStatic spreadsheet tableLive Kanban with automatic progress
Material controlManual list, shortages found lateAutomatic BOM coverage
Bottleneck detectionOnce you are already lateBottleneck Score in real time
Delivery datesOptimistic estimatesBased on Factory Physics
ReplanningWeekly meetingContinuous, automatic

Promise dates you
can actually meet.

Patok connects your work orders to your plant's real capacity. Plan with physics, not with wishes.

OEE & Metrics